亚洲午夜福利I奇米影视7777I91久久精品无码一区二区三区I成人精品在线观看I日韩精品二区三四区五电影I91妈妈网调教I18 无套直国产红桃I日韩视频一区I一区三区I色欲一区I成人区人妻精品一I538在线精品

Location:Home / News

News

Industry News

Siemens installs final turbine at 144-MW wind farm in Dutch waters

Time:02 Mar,2016
Rotor blade installation at Westermeerwind wind farm. Source: Westermeerwind Mar 1, 2016 12:07 CET by Ivan Shumkov March 1 (SeeNews) - German industrial major Siemens (FRA:SIE) has finished installing the last of the 48 wind turbines that make up the 144-MW Westermeerwind wind farm in Dutch waters. The plant will now undergo a testing period, the project company said in a press release on Tuesday. The installation of the foundations, cables and turbines took one year, as planned. The Westermeerwind facility is part of a larger complex, called Noordoostpolder Wind Farm, which consists of 86 wind turbines erected both in the water and on land along the dikes of the IJsselmeer freshwater lake. “At this time Westermeerwind Wind Farm is the largest wind farm in the Netherlands,” said Anne de Groot, director of Westermeerwind. Siemens built the wind park as the main contractor and will also maintain the facility for at least 15 years. Eneco will buy the plant’s output.
2017 © SUFUL bearing.ALL Right Reserved
logo